top of page
Prefabrication
In my 3rd semester, our task was to develop a prefabricated modular building component system, which could be used in the design of 3 – 4 story apartment houses.
The assignment was to develop a final design, technical solutions and documents for the construction, as well as a detailed proposal for one component, which in my case was the horizontal division.
bottom of page